Services

Seven disciplines. One specialty: keeping liquid flowing through compute.

We don't do HVAC, fire suppression, or generator work. We do hydronics for AI halls — and we do it deeply.

01 / 07

24/7 Emergency Response

Engineers en route in 2–4 hours for leak containment, pump trips, CDU failover, manifold pressure drops, and ΔT/ΔP excursions. Spare parts on every truck.

  • Leak isolation & containment
  • Pump & VFD diagnostics
  • Coolant top-off & purge
  • Pressure stabilization
02 / 07

Hydronic Design & Consulting

Secondary loop sizing, CDU placement, manifold routing, expansion tanks, and redundancy schemes for NVIDIA Blackwell, H100, MI300X, and TPU pods.

  • Loop architecture & P&IDs
  • CDU sizing & redundancy
  • Retrofit air→liquid plans
  • Heat-reuse interfaces
03 / 07

Installation & Commissioning

Manifold and QD installation with documented torque, leak-down, and chemistry baselining. Cleanroom-safe procedures and traceable joint logs.

  • Blind-mate QDs
  • Brazing & press fittings
  • Pressure & helium leak tests
  • As-built documentation
04 / 07

Water & Fluid Strategy

Sourcing, treatment, glycol/dielectric fluid management, biocide regimes, discharge planning, and audit-ready chemistry records.

  • PG/EG glycol management
  • Dielectric fluid handling
  • Biocide & filtration
  • Discharge & permit support
05 / 07

Retrofits & Capacity Upgrades

From legacy air-cooled halls to direct-to-chip, rear-door heat exchangers, or full immersion — phased without taking the hall offline.

  • Air → DLC conversions
  • Rear-door HX upgrades
  • Immersion pilots
  • Live-hall phasing
06 / 07

Hydronic Academy

Cohort-based training and certification for data center technicians on safe handling of liquid loops, fluids, and high-density environments.

  • Fluid handling safety
  • Leak detection drills
  • QD procedures
  • On-call operations
07 / 07

Heat Reuse & Sustainability

Tie warm-water return loops into district heating, greenhouses, or industrial processes. Engineering, modeling, and contractor coordination.

  • 55°C return reuse
  • District heat interfaces
  • PUE/WUE optimization
  • Reporting & MRV

Need immediate hydronic support?